Overview

Following appointment through a competitive tender process, we delivered the replacement of an ageing and failing heating pipework system across a live school campus, alongside the refurbishment of two WC areas within the summer holidays.

The project combined complex infrastructure upgrades with internal refurbishment works, all delivered within a tight programme to ensure the school could return to full operation without disruption.

By carefully managing sequencing, and leveraging our directly employed foreman and in-house interiors team, the programme was accelerated — successfully condensing a 10-week scope of works into the 8-week summer holiday window.

Scope of work

  • Full replacement of existing threaded steel heating pipework across the main school building
  • Associated asbestos removal works
  • Ceiling replacement works
  • Passive fire protection upgrades
  • LED lighting installation
  • Fire alarm works
  • Associated internal decorations
  • Full strip-out of existing WC facilities
  • Reconfiguration from split-sex layout to open plan same-sex arrangement
  • Installation of new sanitaryware and IPS systems
  • Installation of solid partition cubicles
  • Whiterock wall finishes and vinyl flooring