Marshgate Industrial Estate, Swindon
Client:
Marshgate Holdings Ltd
Value:
£1.5m
Programme:
15 months
Overview
We were appointed to deliver the full refurbishment of Unit 1, Marshgate Industrial Estate in Swindon, transforming a vacant and deteriorated warehouse and office facility into a modern, functional space ready for the
incoming tenant, Holt JCB.
Following years of alteration, damage and vandalism, the building was stripped back to its structural frame. This exposed a number of issues, including defects in the steelwork and masonry, which were carefully repaired as part of the programme.
Alongside the core refurbishment, the scheme included significant external works to support the tenant’s operations, including a large new concrete yard and upgrades to drainage infrastructure. The result is a fully refurbished unit designed to support both office and largescale plant operations.

Scope of work
- Full strip‑out of the building back to structural steel frame
- Safe removal of asbestos materials
- Structural repairs to steelwork and masonry
- Installation of new timber floor structures in office areas
- Formation of internal partitions and circulation routes
- Construction of secondary fire escape
- Full upgrade of M&E installations
- Installation of new finishes, fittings and decorations throughout
- Full internal redecoration
- Application of epoxy coating to warehouse floor
- Installation of new foul and surface water drainage systems, including petrol interceptor
- Construction of a new 1100m² external concrete yard slab to support plant operations
- Design and installation of a new single‑storey glazed entrance reception
to the front elevation