Changing Places, Fishponds Library
Client:
Bristol City Council
Value:
£69k
Programme:
8 Weeks
Overview
We were appointed to deliver the construction of a ‘Changing Places’ accessible toilet facility, supporting the Government’s Department for Levelling Up, Housing & Communities initiative in association with Muscular Dystrophy UK.
The project involved transforming an existing office space into a fully compliant, specialist accessible facility designed to support severely disabled users. The scheme required careful coordination of structural alterations, building services and specialist installations to meet the necessary accessibility standards.
Scope of work
- Strip-out and demolition of existing partitions, glazing and finishes
- Construction of new fire-rated partitions to form the accessible WC and lobby
- Installation of blockwork upstands to accommodate existing underfloor heating constraints
- Diamond drilling to concrete soffit and installation of structural steel supports for hoist system
- Installation of suspended ceiling
- Vinyl flooring throughout
- Full height Whiterock hygienic wall cladding
- IPS panelling and associated sanitaryware installation
- Lighting and emergency lighting installation
- Fire alarm integration
- Small power and emergency alarm systems
- Installation of hot and cold water and waste services
- Supply and installation of hoist and accessible equipment by specialist contractor Astor-Bannerman
